RE Nice
  • News
  • Business
  • Real estate
  • Economy
  • House
  • Investment
  • Society
RE Nice – all about real estate and houses in Nice
  • News
  • Business
  • Real estate
  • Economy
  • House
  • Investment
  • Society

Buying a site.

  • January 14, 2019

Buying a land plot.

A successful redemption of a land plot, fully consistent with your wishes – the result of a thorough search planned at the starting points of the criteria. It is always useful to keep a list of such strong points at hand in order to be sure that everything is really taken into account.

The assessment value of the site is affected primarily by its intended purpose. There are 2 main types of areas: housing and public buildings for the differentiation of the land code.

The initial clear certainty with the aim of using the purchase will relieve difficulties in the future. Theoretically reoriented and re-registered documents can still be then avoided, but it will not work to avoid additional expenses, and in time you will delay the entire process for at least 2 weeks.

To rush events, starting a construction site on a purchased, but not registered area, is very risky – without a mailing address, you can simply not get registration. Having found out this nuance at once from the seller, you can fearlessly promote the design of the design further.

On the territory of the village or town of cottage type you may encounter options that include the terms of the contract (development plan) and without it. Cheap sentences with the inclusion of a contract will definitely not.

Technical documents for connecting communications should be on the hands of the developer. Otherwise, it is worth concluding an agreement to bring them, which will contain complete information about the types of communications, the timing of installation work for each connection, the conditions for liability for the safety. Operational characteristics of the working resources of the connection (gas, water, electricity, etc.) are also recorded by the developer. Independent connection is practically excluded. The cause of categorical refusal can be a multi-level state structure of engineering and design bureaus. They will manage and plan trunk connections to the settlements, calculating the supply of power, the place of cut. Your individual plan can simply exceed the limit of technical standards, so “fit” should be “fit” before, and not after building a separate object.

Share
Tweet
Pin it
Share
Share
You May Also Like
View Post

The importance of repair planning

  • January 27, 2025
View Post

Waterplag

  • January 22, 2025
View Post

Your personal plot – design

  • January 21, 2025
View Post

Hobs

  • January 20, 2025
View Post

Bathroom. Bath enameling.

  • January 6, 2025
View Post

Roller and painting brush

  • January 6, 2025
View Post

Modern bathroom repair

  • December 24, 2024
View Post

Modern toilets.

  • December 20, 2024
Featured Posts
  • Paul coating and equipment
    • November 30, 2018
  • The door is metal.
    • June 18, 2018
  • Natural stone in the landscape – the beauty of nature
    • August 21, 2018
  • Uzbek technology for mixing the solution
    • December 27, 2024
  • Gas stove connection tips
    • November 21, 2024
Recent Posts
  • The importance of the correct choice of materials
    • January 27, 2025
  • The importance of repair planning
    • January 27, 2025
  • The importance of the fittings of a plastic window
    • January 27, 2025
RE Nice – all about real estate and houses in Nice
  • © RE Nice, 2017-2024. All Rights Reserved.

Input your search keywords and press Enter.