Buying a land plot.
A successful redemption of a land plot, fully consistent with your wishes – the result of a thorough search planned at the starting points of the criteria. It is always useful to keep a list of such strong points at hand in order to be sure that everything is really taken into account.
The assessment value of the site is affected primarily by its intended purpose. There are 2 main types of areas: housing and public buildings for the differentiation of the land code.
The initial clear certainty with the aim of using the purchase will relieve difficulties in the future. Theoretically reoriented and re-registered documents can still be then avoided, but it will not work to avoid additional expenses, and in time you will delay the entire process for at least 2 weeks.
To rush events, starting a construction site on a purchased, but not registered area, is very risky – without a mailing address, you can simply not get registration. Having found out this nuance at once from the seller, you can fearlessly promote the design of the design further.
On the territory of the village or town of cottage type you may encounter options that include the terms of the contract (development plan) and without it. Cheap sentences with the inclusion of a contract will definitely not.
Technical documents for connecting communications should be on the hands of the developer. Otherwise, it is worth concluding an agreement to bring them, which will contain complete information about the types of communications, the timing of installation work for each connection, the conditions for liability for the safety. Operational characteristics of the working resources of the connection (gas, water, electricity, etc.) are also recorded by the developer. Independent connection is practically excluded. The cause of categorical refusal can be a multi-level state structure of engineering and design bureaus. They will manage and plan trunk connections to the settlements, calculating the supply of power, the place of cut. Your individual plan can simply exceed the limit of technical standards, so “fit” should be “fit” before, and not after building a separate object.