When erecting any house, it is necessary to take care of installing the drainage system, as it is responsible for collecting excess water throughout the site. Thanks to the structure of this system, the balance of water in the soil is regulated. Thus, you can create acceptable conditions for building a house and planting trees.
If you hire contractors for installing drainage, check the presence of licensing of a management company in the field of housing and communal services of your area. The system consists of many trench pipes, special pumps, as well as wells. In fact, the process of creating this system is quite simple, so even an inexperienced builder will be able to cope with it. However, you should get acquainted with advice from specialists in the fast and reliable installation of the drainage system:
If the landscape of your site is almost even, and there are no drain ditches nearby, then you need to take care of installing pumping stations. In such conditions, it makes no sense to make other decisions, since the station is the only right choice, because it copes with the withdrawal of excess water.
If you have a plot of impressive sizes and plan to create a multi -level drainage system, then it is best to trust professionals in this matter.
The installation of wells for the drainage system should be carried out throughout its perimeter. With their help, you can easily find out how deeply the underground waters are located, and whether the drainage system works as a whole.
Before starting to carry out installation work on the installation of a drainage, it is necessary to first take care of the insulation of the foundation of the building from the water. Basically, the reinforcing mesh is used for this, as well as special mastic.
During the laying of the trench, it is worth taking care of the evenness of its surface. To cope with this task, it is necessary to use a laser level.
When falling asleep, gravel is mainly used. However, it should be remembered that its dimensions should exceed the diameter of the trench pipes in order to prevent their clogging.
When installing the system, it is necessary to take care of the inspection wells. It is best to take the segments of trench pipes and bury them vertically, and then close them tightly with a lid.
The diameter of the observation deck should not be less than half a meter. This size is just enough so that you can clean the system from the garbage entering it.
The surface of the pipes should be wrapped in a geotextile canvas, and it can be fixed using a nylon twig.
The installation of the drainage system should begin in July, since it is during this period that surface water begins to leave.
The process of full installation of the system will take about 4-6 weeks. In no case should you leave the trenches in a wiped state in the winter season, so it is necessary to finish work before the onset of cold weather.